Stage 1 Markets

Deploying across six markets

Data45 enters each market built around its data residency laws and anchor AI programs. Compute that lands in-country, runs on local power, and stays under local control.

Global View

6 target markets

Hover any node to see the anchor program driving demand in that market. More markets follow as the first wave of containers ships.

Stage 1 target market
Where We're Going

Six markets, one deployment model

United States

US

DoD CDAO · FedRAMP

Defense, intelligence, and enterprise AI that demands dedicated, air-gappable hardware on US soil.

UAE

AE

G42 · Sovereign AI

Sovereign AI capacity aligned to the Gulf’s national compute ambitions and rapid build timelines.

Saudi Arabia

SA

HUMAIN · Vision 2030

In-kingdom GPU infrastructure supporting Vision 2030 digital and AI sovereignty programs.

India

IN

IndiaAI Mission

Dedicated compute for the IndiaAI Mission — deployed in-country, under local data residency.

United Kingdom

GB

AISI · NHS · MoD

GDPR-UK compliant deployments for public-sector, health, and defense AI workloads.

African Markets

AF

Nigeria · Kenya · S. Africa · Egypt

Built around the data residency laws of Nigeria, Kenya, South Africa, and Egypt — compute that stays in-country.

Deployment Timeline

What happens after you reach out

Every deployment follows the same disciplined sequence — no surprises, no scope creep. From first conversation to live GPUs: 12 weeks.

  1. W1
    Week 1–2

    Site Assessment & Scoping

    We review your site for power, connectivity, and physical access, assess your workload, and draft an initial container configuration. Fully confidential.

  2. W3
    Week 3–4

    Spec Agreement & Contract

    We finalize the spec — GPU type, power draw, cooling, networking, and compliance requirements. You sign off and the manufacturing schedule is locked.

  3. W5
    Week 5–10

    Container Build & Commissioning

    GPUs are installed, racks are wired, cooling is plumbed, and the unit is tested under load at our facility. You receive weekly progress updates.

  4. W11
    Week 11–12

    On-Site Delivery & Power-On

    The container is transported to your location. Our field team connects power and fiber, runs final diagnostics, and hands over a live system.

  5. Ongoing

    Managed Operations

    Data45 monitors and maintains the hardware layer — scheduled maintenance, hardware alerts, and GPU lifecycle management — with uptime guarantees in writing.

The Third Option

Data45 vs. building vs. cloud

DimensionData45Build your ownPublic cloud
Time to live compute12 weeks2–4 yearsDays, but shared
Data residencyAt your siteAt your siteLeaves your walls
Power flexibilityGrid or BTM gasYears to connectN/A
Air-gap / sovereign modeYesPossibleNo
Predictable total costFixed contractHigh CapEx riskVariable / opaque